A hydropower plant construction project including the construction of weir, intake settling basin, headrace canal, bridge, forebay, powerhouse, tailrace canal, etc. Massive quantum of rock excavation works and complex dewatering requirements are highlights of this project. Employer – ESCAS Ankanda (Pvt) Ltd.
- Start date: 2016-11-02
- End date: 2017-01-17
- Duration: 1 Year
- Cost: RS. 408,915,850.00